It's Friday night, sunny and 75 degrees outside. Yet I reside in my basement continuing the bathroom renovation. Now that I have the shut-off valves installed (below), I can now demo the shower stall wall (2nd below in the cyan oblique). After that's done, it's time to prep for drywall and tiling. This project won't be finished by next week. *sigh