Posted by
Adam
In:
work night by painter's light
It's Friday night, sunny and 75 degrees outside. Yet I reside in my basement continuing the bathroom renovation. Now that I have the shut-off valves installed (below), I can now demo the shower stall wall (2nd below in the cyan oblique). After that's done, it's time to prep for drywall and tiling. This project won't be finished by next week. *sigh
This entry was posted on 6:03 PM
You can follow any responses to this entry through
the RSS 2.0 feed.
You can leave a response,
or trackback from your own site.
Posted on
-
0 Comments
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment